Know before you commit. Buildable percentage, SETENA requirements, utility connections, road access, and a slope-based site plan — all before breaking ground.
Check Development PotentialOne report answers the four questions every developer needs answered before committing capital to a parcel.
Every square metre of your parcel classified against CFIA slope thresholds.
Know your EIA category before engaging a consultant.
Power and water connection distances and estimated cost ranges.
Full buildability and infrastructure report in one business day.
LiDAR-derived slope map with INVU/CFIA slope thresholds: 0–15% buildable, 15–30% restricted, 30%+ prohibited. Buildable area calculated in m² and as a percentage of total parcel.
Environmental impact assessment trigger analysis: development >1 ha requires SETENA D1; proximity to rivers, wetlands, or protected areas escalates to D2; forest clearing requires SINAC permit.
Distance to power grid (ICE), water main (AyA), paved road (MOPT), and nearest town. Estimated connection cost ranges included for budgeting.
Full LiDAR topographic survey for site layout. DTM, drainage network, cut/fill volumes for road and pad grading, contours at 0.5 m intervals.
We run feasibility analysis for every development type in Costa Rica.
Buildable zones, SETENA triggers, utility gaps — all in one feasibility report. Search your parcel to get started.
Check Development Potential →